ProForm™ Needs Help! The Demand for ProForm™ is Gaining Steam…

ProForm™ Needs Help!  The Demand for ProForm™ is Gaining Steam… Become a ProForm™ Partner before it’s too late. Dealerships will be offered to a limited number of chimney professionals to avoid market saturation.  Be the first in your area to lock in your territory!

Sweeping-Ad

 

 

Posted in ProForm News | Leave a comment

ProForm Chimney Restoration™ Makes History!

The Christ Church in Philadelphia recently upgraded their boiler to a high efficiency gas boiler and looked no further than ProForm Chimney Restoration to provide a new long lasting chimney liner.  The original over sized chimney flue was relined with a Philadelphia Gas Works approved Dual Fuel ProForm Chimney Liner.

Historic Christ Church

Christ Church

Known as “The Nation’s Church” because of the famous Revolutionary-era leaders who worshiped here, Christ Church was founded in 1695. It was the first parish of the Church of England (Anglican) in Pennsylvania. It is also the birthplace of the American Episcopal Church.  Talks on the church’s rich history are given throughout the day.

We are so proud our system was chosen and trusted to be installed in the Historic Landmark building and we are looking forward to many more.  Here are some pictures from that historic day.

ProForm Christ Church107ProForm Christ Church103ProForm Christ Church128ProForm Christ Church131ProForm Christ Church101ProForm Christ Church104ProForm Christ Church160 ProForm Christ Church159 ProForm Christ Church158   ProForm Christ Church100ProForm Christ Church110ProForm Christ Church105ProForm Christ Church111ProForm Christ Church109       ProForm Christ Church135ProForm Christ Church127              ProForm Christ Church126 ProForm Christ Church124ProForm Christ Church121ProForm Christ Church123ProForm Christ Church122ProForm Christ Church116ProForm Christ Church117ProForm Christ Church144ProForm Christ Church115ProForm Christ Church114ProForm Christ Church119ProForm Christ Church141ProForm Christ Church143ProForm Christ Church146ProForm Christ Church145ProForm Christ Church155ProForm Christ Church154ProForm Christ Church148 ProForm Christ Church157 ProForm Christ Church156ProForm Christ Church150ProForm Christ Church152 ProForm Christ Church149          ProForm Christ Church106

 

 

 

Posted in ProForm News | Tagged , , , , , , , | Leave a comment

ProForming in the Rain….

This week an 85′ x 22″ ProForm™Liner was installed on this windy and rainy Wednesday.   The job was complete by 2:15pm…this time we beat the traffic home!

Here are some pics….

ProForm062ProForm067 ProForm063 ProForm064 ProForm065 ProForm066  ProForm068ProForm060 ProForm069

Posted in ProForm News | Leave a comment

A Couple of new ProForm™ Installs….

 

 

 

 

 

 

ProForm038 ProForm036 ProForm025 ProForm006 ProForm008 ProForm002 ProForm028 ProForm027

Posted in ProForm News | Leave a comment

ProForm Chimney Restoration™ Installs a 22″ x 180’Liner

This week ProForm Chimney Restoration™ installed a 22″ diameter liner 180 feet long in NYC.  The 850 lb liner was taken down to the basement via the elevator, then hoisted up the existing flue.  Two steam generators were used to inflate and cure the liner.  The entire job was completed in 1 1/2 days.  Check out the photos and video…

ProForm011

ProForm034 14 Story Building

ProForm020

180′ liner in the elevator heading for the basement

ProForm035

Liner stacked and ready to be hoisted up the chimney

ProForm019

Liner is exiting the elevator being transferred to the boiler room

ProForm005

ProForm033

Ready for Inflation

ProForm032

All puffed up….waiting to cure

ProForm030

22″ Liner inflated through the tee fitting

ProForm029

ProForm™ bus ready to be loaded

 

 

 

 

Posted in ProForm News | Leave a comment

Tricky ProForm™ Install is a Success

This contractor made a decision to run the ProForm™ liner directly into the smoke pipe to eliminate the need for a T connection.  We were able to accommodate the request due to the access port on the side of the smoke pipe which allowed us to attach the bottom steam fitting.  After the liner was cured, the ProForm™ liner was cut inside the smoke pipe forming a seamless transition from smoke pipe to flue.  By the way, that flue was 8″ x 24″ and had no issues transitioning into a round pipe.

IMG_1267FullSizeRender 3 FullSizeRender 2

Posted in ProForm News | Leave a comment

What a Beautiful Flue!

Anyone in the industry will appreciate these pictures.  Notice the offsets and shape changes and the incredibly smooth surface of this 70′ flue.

IMG_1304-2 IMG_1287 IMG_1286 IMG_1285

Posted in ProForm News | Leave a comment

Last Week’s ProForm™ Jobs

Last week ProForm Chimney Restoration™ performed On-Site training for 2 of its newest partners.

IMG_1276 IMG_1266 copy

 

IMG_1303 IMG_1297 IMG_1296 IMG_1287 IMG_1283 IMG_1290 IMG_1279

Posted in ProForm News | Leave a comment

ProForm™ Loves the Autumn Weather

Gone are the Hazy, Hot, and Humid days of summer….ProForm™ welcomes the fall weather…

IMG_1288

Posted in ProForm News | Leave a comment

Views from the Roof

Installing ProForm™ in NYC has it’s perks…Check out these roof top views of NYC…. more to come soon!

 

IMG_1186 IMG_1184 IMG_1180 IMG_1179 IMG_1174 IMG_1169 IMG_1168 IMG_1167 FullSizeRender 3 20150915_120529 20150914_153857 20150914_153846 20150914_151319

Posted in ProForm News | 1 Comment